Comment periods closed April 2025; permit decisions not confirmed. The Corps comment period closed April 13, 2025, and the coastal use permit's on April 23, 2025. We haven't confirmed either agency's decision. Status as of 2025-04-18.

Lapis Energy Lake Salvador Carbon Sequestration Project

Submit comments to the Office of Coastal Management regarding Coastal Use Permit P20240989

Project Summary for OCM Consideration

Critical Coastal Concerns

The Lapis Energy Lake Salvador Carbon Sequestration Project proposes CO₂ injection wells, access roads, and related infrastructure in Louisiana wetlands. The project would significantly impact coastal resources under OCM's jurisdiction and conflicts with existing coastal restoration efforts.

Key OCM Concerns

  1. Direct conflicts with Louisiana's existing coastal restoration initiatives in the Lake Salvador area
  2. Significant wetland impacts with inadequate mitigation planning
  3. Hydrological alteration from infrastructure impeding natural water flow in coastal wetlands
  4. Impacts on protected species including the Alligator Snapping Turtle and Pallid Sturgeon
  5. Interference with traditional coastal uses including fishing, hunting, and ecotourism
  6. Inadequate Hydrologic Modification Impact Analysis (HMIA) that fails to address groundwater impacts
  7. Insufficient alternatives analysis to demonstrate avoidance of wetland impacts

Project Details Relevant to OCM

OCM Permit: P20240989

Location: Lake Salvador, LA

Comment Deadline: April 23, 2025

Project Infrastructure in Coastal Zone:

Corporate Background

Key ownership information:

Corporate Compliance Concerns:

ExxonMobil has hundreds of existing compliance issues in Louisiana, including unfulfilled coastal restoration obligations in the Barataria Basin that should be addressed before new permits are issued.

Submit Comments to OCM by April 23, 2025

The Louisiana Department of Natural Resources, Office of Coastal Management is accepting public comments on Coastal Use Permit (CUP) P20240989.

Submit Comment on OCM Site

Or email Emily Eley and mention the permit number (P20240989).

OCM's Role:

The Office of Coastal Management is responsible for implementing the Louisiana Coastal Resources Program and balancing conservation and restoration with coastal economic development.

OCM's Jurisdiction

The Office of Coastal Management specifically reviews:

Your comments should focus on these areas of OCM responsibility.

Aerial view of Lake Salvador wetlands

Location of proposed main well pad in the middle of wetlands.

Impacts on Coastal Resources

Wetland Impacts and Mitigation Deficiencies

The application acknowledges the dominant vegetation is:

However, the application is still deficient in several critical areas:

Inadequate Hydrologic Modification Impact Analysis

The submitted HMIA contains several unsupported claims:

Direct Conflicts with Louisiana's Coastal Restoration Initiatives

Lake Salvador shoreline protection projects

Louisiana's Coastal Master Plan Projects

Lake Salvador Shoreline Protection Demonstration Project (BA-15)

Des Allemands Swamp Restoration:

More Lake Salvador Shoreline Protection Details:

More Des Allemands Swamp Restoration Details:

Critical Habitats and Protected Species

Salvador Wildlife Management Area Features

Protected Species in the Coastal Zone

The coastal zone likely provides habitat for several protected species that could be impacted:

Impacts on Traditional Coastal Uses

Fishing

Hunting

Wildlife Viewing

Tourism

Environmental Research Supporting Concerns

Scientific Evidence of Environmental Impacts

Research Documenting Infrastructure Impacts in Wetlands

Hydrological Disruption

Infrastructure Effects

Biodiversity Impacts

Cumulative Regional Impacts

Part of a Larger Network of CO₂ Projects

This project is one of numerous interconnected CO₂ injection and pipeline proposals in the Barataria watershed by the same corporate entities, including:

Safety Concerns Based on Existing Infrastructure

Cumulative Impact:

There are over 40 similar injection sites proposed within the New Orleans and Vicksburg Districts, with potential CO₂ pipelines extending over 800 miles and impacting an estimated 3,000-4,000 acres of wetlands directly.

Evidence-Based Minimization Strategies Missing from Application

Research-Supported Approaches to Reduce Wetland Impacts

Infrastructure Design and Placement

Hydrological Management

Beneficial Use Opportunities

Permit Application Deficiencies Relevant to OCM

Insufficient Avoidance & Minimization

Inadequate Coastal Impact Analysis

Conclusion and Recommendations for OCM

Key Findings Relevant to OCM

Recommendations for OCM

The Office of Coastal Management should:

  1. Deny the Coastal Use Permit P20240989 in its current form due to insufficient information and unsupported claims in the HMIA
  2. Require a scientifically rigorous hydrological analysis that addresses both surface and groundwater impacts
  3. Demand specific details on culvert design and placement with supporting calculations demonstrating effectiveness
  4. Require a comprehensive analysis of how the project would impact existing coastal restoration projects
  1. Mandate a detailed assessment of impacts on threatened and endangered species in the coastal zone
  2. Insist on specific mitigation measures based on scientific research, including alignment of access roads parallel to water flow and beneficial use of excavated material
  3. Request a public hearing to allow coastal stakeholders to provide their knowledge and concerns
  4. Require a Programmatic Environmental Impact Statement (PEIS) to evaluate the cumulative impacts of all related CO₂ projects in the region rather than reviewing this project in isolation

Submit OCM Comments Before April 23, 2025

Your voice matters! Submit your comments on the Lapis Energy Lake Salvador Carbon Sequestration Project to the Office of Coastal Management.

Submit Comment to OCM Email Emily Eley

When submitting, be sure to reference Coastal Use Permit P20240989
Focus your comments on coastal impacts within OCM's jurisdiction

Resources

Earlier phase: the Corps permit, MVN-2025-00066-EMM.

Tell a neighbor

Lapis Energy's carbon sequestration project in Lake Salvador: the state coastal use permit and the Corps permit.

Share on Facebook Email it